EarthCore ECO-Steel Installation And Maintenance Instruction - Page 3
Browse online or download pdf Installation And Maintenance Instruction for Ventilation Hood EarthCore ECO-Steel. EarthCore ECO-Steel 8 pages. 1700ºf air-cooled and insulated chimney size 13”
Attach Chimney: Attach the first section of chimney
on the Anchor Plate. The joint assembly is a male
to female slip fit and held together with button lock
tabs. See FIG 2. Maintain a 2 inch clearance to
combustibles. Do not fill the clearance space with
any materials. If an offset is required, refer to Elbow
Offset Installation Section.
KNOCKOUT
FOR LOCK
FIG. 2
Frame Openings: From the ceiling, drop a plumb
bob to the center of the fireplace's flue outlet and
mark the center point on the ceiling. Refer to
TABLE 1 for the framing dimensions.
Frame Opening Dimensions
Flue Diameter
12.5" ID
TABLE 1
Mark appropriate cutting lines around the center
point. Cut a square hole in the ceiling. Frame a
level, square opening centered over the hole that
you have cut. Frame openings at each floor level
above the fireplace. See FIG. 3. These openings
are to hold the Firestop and Attic Insulation Shield.
Locate each opening by dropping a plumb bob to
the four corners of the opening below. Maintain the
2 inch airspace to combustibles. See FIG. 4.
BUTTON LOCK
Framing Dimensions
19.5" X 19.5"
FEMALE END
CEILING/FLOOR
MALE END
CEILING/FLOOR
3
CAP
STORM COLLAR
FLASHING
CHIMNEY
ATTIC INSULATION SHIELD
FIRESTOP
CHIMNEY
FIRESTOP
CHIMNEY
ANCHOR PLATE
ISOWOOL BLANKET
FIREPLACE
FIG. 3