3 Day Blinds ARCH Assembly/Installation Instructions - Page 5
Browse online or download pdf Assembly/Installation Instructions for Window Blinds 3 Day Blinds ARCH. 3 Day Blinds ARCH 8 pages.
arch over a new BLInd InSTaLLaTIon
• Attach the brackets as shown in the bottom blind's Installation
Instructions. Continue below to "Arch Over An Existing Blind
Installation".
• Starting at the top of the arch
insert slats leaving enough
room for securing mounting
screws into the bottom rail
(leave out approximately 4 - 8
slats for now).
• Attach the arch bottom rail to
the window sill using the 1
drywall screws.
• Remove and discard the wood
shims located in the bottom
groove of each vertical arch
support.
• Continue inserting the remaining
wood slats to create the
completed arch.
• Using a level, hold the partially
completed arch to the correct
position inside or outside the
window to determine where the
2" wood blind mounting
brackets will be placed for both
the arch and the blind. Using a
pencil, draw a small line on the
wall under the arch bottom rail
at both ends of the arch to
establish where the 2" wood
blind ounting brackets will be
attached.
Page 4
/
"
1
4