Dell EMC S4112T-ON Setup Manual - Page 12
Browse online or download pdf Setup Manual for Switch Dell EMC S4112T-ON. Dell EMC S4112T-ON 26 pages.
•
One RJ-45 to DB-9 female cable
•
AC power: two country- and region-specific AC power cords
•
DC power: two DC connectors
•
Ground lug kit (included in the accessories box)
•
S4112-ON Series Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean
surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
Ground cable
NOTE:
For an AC-powered switch, although the third conductor of the AC power
cord provides a ground path, Dell EMC recommends grounding your switch with a
dedicated ground wire.
NOTE:
For a DC-powered switch, the only way to safely ground your switch is to
attach a dedicated ground wire. The ground lug kit ships in a plastic bag placed with
the other accessories inside the shipping box. The ground lug bracket screws ship
attached to the switch. Before you install the DC switch in the dual-tray, attach the
ground lug and bracket to the switch using the included screws and then attach the
DC ground wire to the ground lug.
NOTE:
The S4112-ON Series has a DC power source rated -40 to -72 VDC, 6A
minimum, Tma=40C, and an altitude operation of 3048m. The power cable is
10AWG, 16A minimum, with a 72V minimum rating.
The ground cable is not included. To properly ground the chassis, Dell EMC recommends a
one- or two-hole lug, M4 hole size. The ground lugs must be a UL-recognized, crimp-type
lug.
CAUTION:
Grounding conductors
conductors.
12
S4112-ON Series Installation
must be made of copper. Do not use aluminum