Dell Networking S5000 Installation Manual - Page 19
Browse online or download pdf Installation Manual for Switch Dell Networking S5000. Dell Networking S5000 50 pages. Data center switch
Also for Dell Networking S5000: Configuration Manual (12 pages), Configuration Manual (17 pages), Getting Started Manual (37 pages)
Site Preparations
The S5000 is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
•
network telecommunication facilities
•
data centers
•
other locations where the National Electric Code (NEC) applies
This chapter contains the following sections:
•
Site Selection
•
Cabinet Placement
•
Storing Components
Site Selection
Dell Networking equipment is intended for installation in restricted access areas. A restricted access area can only be
accessed by service personnel by using a special tool, lock, key or other means of security and access is controlled by
the authority responsible for the location.
Ensure that the area where you install your S5000 system meets the following safety requirements:
•
Near an adequate power source. Connect the system to the appropriate branch circuit protection as defined by
your local electrical codes.
•
Environmental temperature between 32° to 104°F (0° to 40°C).
•
Relative humidity that does not exceed 85 percent noncondensing.
•
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents
or direct sunlight.
•
Away from sources of severe electromagnetic noise.
•
Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the S5000 for
proper ventilation and access.
Cabinet Placement
Install the S5000 only in indoor cabinets designed for use in a controlled environment as described in
The cabinet must meet the following criteria:
•
Minimum cabinet size and airflow are according to the Electronic Industries Alliance (EIA) standard.
5
Site
Selection.
19