Dell Networking Z9500 Installation Manual - Page 23
Browse online or download pdf Installation Manual for Switch Dell Networking Z9500. Dell Networking Z9500 47 pages. Z9500 switch
Also for Dell Networking Z9500: Getting Started Manual (34 pages)
Mounting the Chassis in a Four-Post Rack
Rack Mounting Safety Considerations
WARNING: You must use a lifting device, such as a fork-lift trolley, to lift the chassis.
WARNING: These instructions are a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory information booklet before you begin.
•
Rack loading — Overloading or uneven loading of racks may result in shelf or rack failure, which may
damage equipment and cause possible personal injury. Stabilize racks in a permanent location before
loading begins. Mount the components beginning at the bottom of the rack, then work to the top. Do
not exceed your rack load rating.
•
Power considerations — Connect only to the power source specified on the unit. When multiple
electrical components are installed in a rack, ensure that the total component power ratings do not
exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock
hazards.
Z9500 Installation
23