Dell S3100 Series Getting Started Manual - Page 34
Browse online or download pdf Getting Started Manual for Switch Dell S3100 Series. Dell S3100 Series 46 pages.
Also for Dell S3100 Series: Installation Manual (45 pages), Getting Started Manual (27 pages)
Figure 25. Attaching the Switch Rails
2.
After you have installed both switch rails, line them up on the previously mounted ReadyRails and
slide the switch in until it is flush with the front of the rack. About three inches before you fully insert
your switch, the rail locking feature engages to keep the switch from inadvertently sliding out of the
rack and falling.
NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace.
34
Installation