Dell S3100 Series Getting Started Manual - Page 16
Browse online or download pdf Getting Started Manual for Switch Dell S3100 Series. Dell S3100 Series 27 pages.
Also for Dell S3100 Series: Getting Started Manual (46 pages), Installation Manual (45 pages)
Supply Power and Power Up the System
Supply power after the switch is mounted in a rack or cabinet.
Dell Networking recommends reinspecting your system prior to powering up.
Verify that:
•
The equipment is properly secured to the rack.
•
The equipment rack is properly mounted and grounded.
•
The ambient temperature around the unit (which may be higher than the
room temperature) is within the limits specified for the system.
•
There is sufficient airflow around the unit.
•
The input circuits are correctly sized for the loads and that you use
sufficient overcurrent protection devices.
•
All protective covers are in place.
CAUTION: ESD damage can occur if the components are mishandled.
Always wear an ESD-preventive wrist or heel ground strap when
handling the system and its components.
Supply power to the system:
•
Plug in the AC cord from the switch PSU to the external power source,
such as an AC wall outlet. Make sure that the power cord is secure.
•
When the cable is connected between the system and the power source,
the switch is powered up; there is no on/off switch.
16
Installation