Dell S4100-ON Series Installation Manual - Page 25
Browse online or download pdf Installation Manual for Switch Dell S4100-ON Series. Dell S4100-ON Series 48 pages.
Also for Dell S4100-ON Series: Installation Manual (47 pages), Setup Manual (21 pages), Installation Manual (49 pages)
Figure 13. Two-post center-mount installation
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3
Repeat this procedure for the second rail.
Four-post threaded installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver.
Retain the latch castings for future rack requirements.
S4100–ON Series installation
25