Dell S4248FB-ON Installation Manual - Page 23
Browse online or download pdf Installation Manual for Switch Dell S4248FB-ON. Dell S4248FB-ON 47 pages. S4200-on series
Also for Dell S4248FB-ON: Setup Manual (29 pages)

Figure 11. Two-post center-mount threaded round-hole installation
2
Slide the back bracket towards the post. Secure it with two user-supplied screws, see item 2.
3
Slide the front bracket forward against the front of the vertical post and secure it to the post flange with two user-supplied screws,
see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the bracket rearward until it clicks into place and secure the rail bracket to the front of the post flange with two user-supplied
screws, item 1.
S4200-ON Series installation
23