Dell S4248FBL-ON Installation Manual - Page 22

Browse online or download pdf Installation Manual for Switch Dell S4248FBL-ON. Dell S4248FBL-ON 47 pages. S4200-on series
Also for Dell S4248FBL-ON: Setup Manual (29 pages)

Dell S4248FBL-ON Installation Manual
Figure 10. 1U tool-less nonthreaded square hole installation
2
Align and seat the front flange pegs in the holes on the front side of the vertical post.
NOTE:
Be sure that the rails click into place and are secure.
3
Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each flange ear and unseat each rail.

Two-post flush-mount installation

CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly, see item 1.
Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements. Do not remove the back latch castings.
22
S4200-ON Series installation