Entec Solar E-1000 Quick Start Manual - Page 3

Browse online or download pdf Quick Start Manual for Measuring Instruments Entec Solar E-1000. Entec Solar E-1000 17 pages.

Entec Solar E-1000 Quick Start Manual

1 Important security information

IMPORTANT: Entec Solar does not take any responsibility on the damage to
the device or people due to an incorrect usage of the devices. It is responsibility of
the user to follow all the indications stated on the manual to make a proper use of the
devices.
- Read and keep the manual and follow all the instructions stated on it.
- Use the device only on solar photovoltaic installations.
- Make use of the Personal Protection Equipment (PPE) recommended for electrical
measurements as well as the connection and disconnection of the electrical circuit
under test.
- Disconnect the photovoltaic circuit under test from any other circuit, p.e. inverter, com
-biner box, grounding and other string on parallel before connecting the I-V curve
tracer.
- Make sure that the photovoltaic circuit does not surpass the technical limit of the
device used. In the case of E-1000, the limits are 1000V and 20A.
- Never disconnect the measurement wires while performing a measurement.
- Do not perform measurements under moisture conditions or under the rain.
Make sure that no liquid enters inside the device.
- Do not perform measurements under the presence of gas, explosives or dust in the
environment.
- Protect the wires from the power and measurement, from the damage and pressure.
- Use the product only with the products and accessories provided or allowed by
the manufacturer.
3
"Innovative technological developments for the solar photovoltaic industry"
www.entecsolar.es