AVZ Twins Piazzola Installation Instruction - Page 14

Browse online or download pdf Installation Instruction for Accessories AVZ Twins Piazzola. AVZ Twins Piazzola 20 pages. Gastro awning

AVZ Twins Piazzola Installation Instruction
Assembly instructions Twins
17. Drill two holes into the leg as shown in the figure.
18. Use a machine tap M8 to tap a thread in the leg and beam. Provide sufficient lubrication. Minimum
tap 25 mm.
19. Screw the M8x50 adjustments socket screws into both sides of the beam. Allow these to protrude by
± 15 mm. Insert the adjustment socket screws through the holes in the leg and fasten them.
20. Screw the bottom hinge at the top of the leg and the base plate at the bottom.
Piazzola
Butterfly awning
®
®
6x Tap M08 thread
Twins Piazzola EN 27-08-2018
Page 14