Award CH082-60 SI Manual - Page 9

Browse online or download pdf Manual for Ventilation Hood Award CH082-60 SI. Award CH082-60 SI 20 pages.

Procedure for fixing
Dimensional Drawings
Follow the directions of the template for drilling
Connecting and fitting
Before
connecting
Appliance with prefitted power cable:
qualified person.
Installing:
Do not trap the power cable and do not route it over sharp edges. If the
oven is a built-under type, route the cable on the rear corners of the oven to the
socket.
Electrical Connection
Connect the device to the mains and check the operation:
voltage, see the rating plate
connect adhering strictly to the relevant diagram
1. Brown
2. Blue
3. Yellow and Green
INSTALLATION
the
appliance,
The power cable must only be replaced by a
check
the
household
installation.