EarthWay EV-N-Spred C22HDS Assembly And Operating Instructions Manual - Page 4

Browse online or download pdf Assembly And Operating Instructions Manual for Spreader EarthWay EV-N-Spred C22HDS. EarthWay EV-N-Spred C22HDS 6 pages. Broadcast spreader
Also for EarthWay EV-N-Spred C22HDS: Assembly And Operating Instructions Manual (8 pages), Assembly And Operating Instructions Manual (6 pages)

EarthWay EV-N-Spred C22HDS Assembly And Operating Instructions Manual
12.
Next push lever forward to setting "0". Align control rod
with hole in pivot bracket, pull lever backward to insert control
rod through hole in pivot bracket. [T
move easily, loosen slightly to make this step easier]
Now install 1/4-20 regular nut on to Control rod.
DO NOT TIGHTEN NUTS YET.
14
. Insert Agitator to pinion shaft on inside of hopper.
N
: Position of flat side of agitator. This pin should be
OTE
installed as shown.
15.
Tension on the flow control lever may be adjusted by
tightening or loosening the tension nut as shown on the right.
: If the lever does not
IP
10.
Install handle shaft to lower handles and pivot & bracket assembly
as shown. Using (4) 1 ½" bolts and (4) locknuts. [T
side first, then attach left (Pivot Bracket) side]
T
IGHTEN BOLTS AND NUTS NOW
11.
nstall flattened end of control rod in to lever on gauge into Control
I
Rod Tabbed hole as shown. Turn to lock in place.
N
:
EXT
Install (1) 1/4-20 Regular Nut [not a locknut] on to Control Rod and
thread halfway as shown to the left.
13.
Pull lever back to setting "30" as shown. Next push pivot &
bracket forward so that the shut off plate in the hopper is in the full open
position. [N
: T
S
OTE
HE
ETTING OF
S
SEMBLY MUST OPEN THE
HUT
.] Now tighten the nuts against the pivot bracket to prevent change
TION
in calibration. Test by opening and closing the Gauge & Lever a few
times to ensure an accurate calibration.
: Attach right
IP
.
"30"
G
& L
ON THE
AUGE
-
OFF COMPLETELY FOR PROPER CALIBRA-
A
EVER
S-
PAGE 4