360 Yield 360 Y-DROP CASE 120 BOOM Instruction Manual - Page 3

Browse online or download pdf Instruction Manual for Farm Equipment 360 Yield 360 Y-DROP CASE 120 BOOM. 360 Yield 360 Y-DROP CASE 120 BOOM 10 pages.

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 55", 115", 177", 217"
and 257" (all measurements are ±5").
Repeat for the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
257"
217"
177"
115"
55"
Figure 3
360YIELDCENTER.COM
CASE 120' BOOM
3