Miele DA 186 Operating And Installation Instructions - Page 26

Browse online or download pdf Operating And Installation Instructions for Ventilation Hood Miele DA 186. Miele DA 186 36 pages. Cooker
Also for Miele DA 186: Operating And Installation Instructions (28 pages), Operating And Installation Instructions (28 pages), Operating And Installation Instructions (28 pages), Operating And Installation Instructions (28 pages)

Miele DA 186 Operating And Installation Instructions
Installation

Fitting the furniture front

There are several holes on the
appliance's vapour canopy for securing
the front panel. A drilling template is
supplied for correct positioning.
 Open the vapour canopy.
 Pull the catch forwards for releasing
the canopy and then swing the
canopy upwards.
26
 Cut the drilling template for the front
panel to size and place it on the
reverse of the panel. Drill the
appropriate holes.
 Then screw the furniture panel to the
vapour canopy with suitable screws.