Miele DA 3180 Operating And Installation Instructions - Page 27
Browse online or download pdf Operating And Installation Instructions for Ventilation Hood Miele DA 3180. Miele DA 3180 36 pages. Ventilation system
Also for Miele DA 3180: Operating And Installation Instructions (40 pages), Dimensions (1 pages), Operating And Installation Instructions (40 pages), Operating And Installation Instructions (40 pages), Operating And Installation Instructions (40 pages)
1. Installing the space bar
T = K cabinet depth minus G hood
depth
^ The hood depth G depends on the
custom panel:
– a Hood installed with a cabinet
matching custom panel
– b Hood installed without front panel
These measures are only valid for the
installation if the front panel sits flush
with the cabinet corpus (without the
door).
If the front panel should be installed
recessed or flush with the cabinet door,
adjust the measure T accordingly.
^ Cut the supplied space bar to
measure T.
Clip it with a knife at the predeter-
mined breaking point of the next
lower measure.
^ Screw the space bar flush with the
wall under the cabinet side walls.
^ At the front edge of the spacer strip
draw a vertical line on left and right
side of the inside cabinet.
Installation
27