360 Yield 360 Y-DROP JOHN DEERE 4930 Instruction Manual - Page 4
Browse online or download pdf Instruction Manual for Farm Equipment 360 Yield 360 Y-DROP JOHN DEERE 4930. 360 Yield 360 Y-DROP JOHN DEERE 4930 11 pages.
INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figure 4
Step 1
With the threads pointing up, install
U-bolt (1) on the bottom side of the
OEM primary boom.
Bag EE
Step 2
Install bracket assembly (2) and flange
lock nut (3).
Hardware Kit D
Step 3
Install extension tube (4).
Step 4
Install boom bracket (5) onto the
extension tube.
Step 5
Install stop bolts (6) at both the front
and the rear of the extension tube.
Hardware Kit B
Figure 5
Step 6
Install stainless steel set screw and
jam nut assembly (1) onto the bracket
assembly.
Hardware Kit D
Repeat Steps 1-6 the remaining mount assemblies
on the OEM primary boom.
INSTRUCTIONS 360 Y-DROP
5
6
Figure 4
Figure 5
360YIELDCENTER.COM
JOHN DEERE 4930/4940
2
3
1
4
1
4