Miele DA 5000 D Operating And Installation Manual - Page 24

Browse online or download pdf Operating And Installation Manual for Ventilation Hood Miele DA 5000 D. Miele DA 5000 D 32 pages. Cooker
Also for Miele DA 5000 D: Operating And Installation Instructions (32 pages), Product Dimensions (2 pages), Operating And Installation Instructions (32 pages), Operating And Installation Instructions (32 pages)

Miele DA 5000 D Operating And Installation Manual

Installation

,
Before installation, it is important
to read the information given on the
following pages as well as the
"Appliance dimensions" and the
"Warning and Safety instructions" at
the beginning of this booklet.
This is particularly crucial when
using the cooker hood at the same
time as a heating appliance that
relies on oxygen from the same
room to avoid the danger of toxic
fumes building up.

Installation instructions

See enclosed Installation sheet for
instructions on how to install this
appliance.

Assembly parts

8 screws 8 x 60 mm with
8 washers and
8 S 10 plugs to secure the cover plates
to the ceiling
,
The screws and plugs are for use
in concrete ceilings only.
For other types of construction,
alternative suitable fixings will be
required.
Make sure the ceiling is strong
enough to bear the weight of the
cooker hood.
24
2 screws M4 x 8 mm for securing the
tower.
8 spacers to use in the event of an
uneven ceiling.
1 floating bracket
1 hose clip for securing the exhaust
ducting to the floating bracket.