Miele Imperial DWW 650 Operating And Installation Manual - Page 23

Browse online or download pdf Operating And Installation Manual for Ventilation Hood Miele Imperial DWW 650. Miele Imperial DWW 650 40 pages.

Miele Imperial DWW 650 Operating And Installation Manual
– Lightly secure retaining plate A into
position using two 5 x 40 mm screws
as shown and use the two notches
to align with the middle line.
– Drill 6 more ø 8 mm holes through
the now fitted retaining plate and
press S8 plugs into the holes.
– Screw four 5 x 40 mm screws into
the two upper and the two lower
holes.
– Hold retaining plate B up to the wall
and push up until directly below the
ceiling. Use the notches and the
centre line to align it horizontally.
Mark the positions for the four holes
to be drilled on the wall.
– Drill four ø 8 mm holes into the wall,
and push the S8 plugs into the holes.
– Screw on the retaining plate with four
5 x 40 mm screws.
Retaining plate C only needs to be
fitted if dimension Y is greater than 415
mm. It provides greater stability for the

extension piece.

23