Miele PUR 98 D Operating And Installation Instructions - Page 18

Browse online or download pdf Operating And Installation Instructions for Ventilation Hood Miele PUR 98 D. Miele PUR 98 D 40 pages. Ventilation system
Also for Miele PUR 98 D: Operating And Installation Instructions (44 pages), Operating And Installation Instructions (48 pages), Operating And Installation Instructions (44 pages), Manual (48 pages)

Miele PUR 98 D Operating And Installation Instructions
Operation

Safety shut-off

If power management has been
deactivated, the ventilation system will
switch itself off automatically after
12 hours if it has been left on (blower
and overhead lighting).
 Pressing the On/Off button  for the
blower or lighting  will switch the
ventilation system back on again.
18