Clean the filter

The filter in the ducting should be
cleaned regularly.
In addition to the Clean airways
setting, you can decide after how
many hours you want the message
Clean out airways, Clean the filters
Check ducting to appear.
The setting you choose will depend on
how much fluff accumulates and on
how often you like to clean the system.
If you find that the filter is very blocked
or, conversely, has very little fluff in it at
the end of the set period of time, you
can choose another setting.
– Factory default: 25 hours.
– Off
– Time interval of 5 to 55 hours

Display res. moisture

The residual moisture of the drying
stage reached is displayed as a %
during the programme sequence.
– Factory default: without
percentage.
Settings/Supervisor level menu

Delay start

You can set a later start time using
the Timer (see "Timer" in the
Operating and installation
instructions).
You can decide how this time is
displayed.
– Programme end
The finish time for the programme is
selected.
– Programme start
The start time for the programme is
selected.
– Time until start
The time to the start of the
programme is selected in
minutes/hours.
– Off
(default setting)
When the Timer button is pressed,
only the programme duration, the
predicted programme finish time and
the current time of day is displayed -
providing Time not displayed has not
been selected in the Time of day
setting.