Miele PT 8401 Operating Instructions Manual - Page 21
Browse online or download pdf Operating Instructions Manual for Dryer Miele PT 8401. Miele PT 8401 26 pages.
Levelling the machine
This machine does not require a plinth. However,
make sure that any uneven areas of the floor are
made level.
The machine must be perfectly level to ensure that it
functions correctly.
The screw feet A can be adjusted to align the
machine.
After aligning the machine correctly you need to use
a screwdriver to secure discs B to the floor plate.
Installation on a raised plinth
The dryer can be installed on a raised concrete
plinth.
,
If the machine is installed on an on-site plinth,
it must be secured using the fixing brackets sup-
plied. Otherwise there is the danger of the ma-
chine moving about.
^ Secure the front feet of the machine with the
clamps supplied.
^ Follow the fitting instructions supplied.
Installation and connection
Fitting the language insert (Programme
selection panel)
Remove the protective film from the control panel.
Carefully lift up the bottom of the control panel foil
underneath the dial, then slide in the language insert
and align it.
Remove the dividers located underneath and press
the control panel foil into position.
Reducing the noise level
This dryer is fitted with an exhaust fan which can be
heard during operation.
If this noise disturbs you it is possible to fit a silencer
(available from Miele as an optional accessory) into
the dryer's exhaust duct (see Installation instructions).
Payment system
All COP models are fitted with a connection for a coin
control unit.
Empty the coin box every day. This prevents too
many coins or tokens collecting in the coin box,
which could lead to the machine breaking down.
Communication module XKM RS232
This machine can be fitted with a communication
module which enables it to be linked to a PC via a se-
rial interface.
The shaft for the communication module is located on
the rear of the machine.
An editor programme is available from Miele.
21