ABB ACQ580-01 Series Quick Installation And Start-Up Manual - Page 14
Browse online or download pdf Quick Installation And Start-Up Manual for Industrial Equipment ABB ACQ580-01 Series. ABB ACQ580-01 Series 17 pages. Ul type 4x (ip66) drives, nec types
Also for ABB ACQ580-01 Series: Manual (16 pages), Quick Installation And Start-Up Manual (17 pages), Quick Installation And Start-Up Manual (16 pages)
Input power cables without disconnect switch option
Frame
L1, L2, L3
size
Min. wire size
(solid/stranded)
2
mm
AWG
R1
0.2/0.2
24
R2
0.5/0.5
20
R3
0.5/0.5
20
Output power cables
Frame
T1/U, T2/V, T3/W, R-, R+/UDC+
size
Min. wire size
(solid/stranded)
2
mm
AWG
R1
0.2/0.2
24
R2
0.5/0.5
20
R3
0.5/0.5
20
Notes:
•
The minimum specified wire size does not necessarily have sufficient current carrying capacity at maximum load.
•
The maximum number of conductors per terminal is 1 except where indicated.
Weights and free space requirements
Frame
size
R1
R2
R3
1) Without free space on the sides.
Frame
size
R1
R2
R3
Max. wire size
(solid/stranded)
2
mm
AWG
6/4
10
16/16
6
35/35
2
Max. wire size
(solid/stranded)
2
mm
AWG
6/4
10
16/16
6
35/35
2
Weights
Free space requirements for vertical installation
Stand alone
Above
Below
kg
lb
mm
in
mm
11.8
26
65
2.6
50
14.5
32
65
2.6
50
26.4 58
65
2.6
50
Free space requirements for horizontal installation
Fan side
Cable box side
mm
in
mm
150
5.9
50
150
5.9
50
200
7.9
50
PE
Tightening torque Max. wire size
(solid/stranded)
2
N·m
lbf·ft
mm
1.0
0.7
16/16
1.5
1.1
16/16
3.5
2.6
35/35
PE
Tightening torque Max. wire size
(solid/stranded)
2
N·m
lbf·ft
mm
1.0
0.7
16/16
1.5
1.1
16/16
3.5
2.6
35/35
Side by side
Sides
Above
in
mm
in
mm
2.0
150
5.9
200
2.0
150
5.9
200
2.0
150
5.9
200
Above
in
mm
in
2.0
200
7.9
2.0
200
7.9
2.0
200
7.9
Tightening
torque
AWG
N·m
6
1.5
6
1.5
2
1.5
Tightening
torque
AWG
N·m
6
1.5
6
1.5
2
1.5
1)
Below
in
mm
in
7.9
200
7.9
7.9
200
7.9
7.9
200
7.9
Below
mm
in
200
7.9
200
7.9
200
7.9
14
lbf·ft
1.1
1.1
1.1
lbf·ft
1.1
1.1
1.1