Miller CST 282 Owner's Manual - Page 24

Browse online or download pdf Owner's Manual for Welding System Miller CST 282. Miller CST 282 42 pages.

Miller CST 282 Owner's Manual
5-8.

Connecting 1-Phase Input Power

1
8
3
6
OM-285986 Page 18
Complete Parts List is available at www.MillerWelds.com
=GND/PE Earth Ground
10
7
9
L1
1
L2
3
6
5
Input1 2012−05 Ref. 803 766-C / 803 942-A
Installation must meet all National
and Local Codes—have only quali-
fied persons make this installation.
Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit. Follow es-
tablished
the installation and removal of
lockout/tagout devices.
Always connect green or green/
yellow
grounding terminal first, and never
to a line terminal.
See rating label on unit and check input volt-
age available at site.
1 Black And White Input Conductor (L1
And L2)
2 Red Input Conductor
3 Green
1
Conductor
4 Insulation Sleeving
5 Electrical Tape
2
Insulate and isolate red conductor as shown.
6 Input Power Cord
7 Disconnect Device (switch shown in the
OFF position)
4
8 Disconnect Device Grounding Terminal
9 Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.
Connect input conductors L1 and L2 to dis-
connect device line terminals.
10 Over-Current Protection
Select type and size of over-current protec-
tion using Electrical Service Guide (fused
disconnect switch shown).
Close and secure door on disconnect device.
Follow established lockout/tagout proce-
dures to put unit in service.
procedures
regarding
conductor
to
supply
Or
Green/Yellow
Grounding