Burkert 2103 Series Quick Start Manual - Page 18
Browse online or download pdf Quick Start Manual for Valve Positioners Burkert 2103 Series. Burkert 2103 Series 19 pages. Remote-positioner, installation on process valves with internal air flow
Also for Burkert 2103 Series: Additional Instructions (12 pages)
9.3
Inspection intervals
The following maintenance work is required for the diaphragm valve:
→ After the first steam sterilization or when required retighten
body screws crosswise.
→ After maximum 10
switching cycles check the diaphragm for
5
wear and replace if required.
Muddy and abrasive media require correspondingly
shorter inspection intervals.
9.4
Cleaning
Commercially available cleaning agents can be used to clean the
outside.
NOTE!
Avoid causing damage with cleaning agents.
▶ Before cleaning, check that the cleaning agents are compat-
ible with the body materials and seals.
18
english
Type 2103, 2104, 2105
Transport, removal
10
TRANSPORT, REMOVAL
NOTE!
Incorrect transport and storage may damage the device.
• During transportation protect the device in shock-resistant
packaging.
• Below the permitted storage temperature from -20 to +65 °C.
• Store the device in a dry and dust-free location.
Damage to the environment caused by device components
contaminated with media.
• Dispose of the device and packaging in an environmentally
friendly manner and observe applicable regulations on disposal.