Chronomite ER-120 240 3P Series Assembly, Installation And Operation Instructions - Page 3
Browse online or download pdf Assembly, Installation And Operation Instructions for Water Heater Chronomite ER-120 240 3P Series. Chronomite ER-120 240 3P Series 7 pages.
3a
Inlet
Valve
5a
Inlet
Pipe
Temperature
Adjustment
Potentiometer
Main Power
3 Phase Contactor
24v Control
Transformer
5b
Outlet
Pipe
Outlet
Valve
3b
(optional)
Outlet
4b
Union
Items Needed for Installation:
Item
Part No.
1
ER-
2
3a/b
4a/b
5a/b
6
L-212
Items 1 and 6 are supplied
4a
Inlet
Union
2
FIGURE 1 - Heater Installation
Title
Chronomite Instant-Temp HCH
Electrical Conduit
Inlet / Outlet Valve – ¾" NPT
Inlet / Outlet Union– ¾" NPT
Copper Inlet / Outlet pipe – ¾"
Faucet Flow Control / Dual
Thread
1
Chronomite
Instant - Temp
HCH
Mounting Holes
Qty 4
Electrical Entrance
located Top and Bottom
Qty
1
Length as required
2
2
Length as required
6
Hi-Limit Thermostats
Heater Module
Description
See Figure 1
Enter via Top or Bottom
Outlet Valve optional
15/16"Male, 55/64"Female L-212
for (L) Low Activation Models
5"
Minimum
Fastener
Clearance
5"
Minimum
Fastener
Clearance
5"
Minimum
Fastener
Clearance
3 |
P a g e