AquaScape 78204 Installation Instructions & Maintenance - Page 5
Browse online or download pdf Installation Instructions & Maintenance for Outdoor Fountain AquaScape 78204. AquaScape 78204 12 pages.
Also for AquaScape 78204: Installation Instructions & Maintenance (8 pages)

NOTE: Water movement can be customized using the tee
fitting or standpipe. Install the standpipe with the tee fitting
or remove the standpipe completely to create a calm,
smooth effect. To create a more dramatic, bubbling effect,
install the standpipe without the tee fitting.
LEVEL THE FOUNTAIN
• It is important to make sure the
Spillway Bowl, Spillway Basin,
and Spillway Bowl Stands are
level from front to back and side
to side (Ex. 9).
• Additional stabilization, such as
using compacted screening bed
material, may be required based
on soil conditions.
Applications
• The Spillway Bowl and Spillway Basin are extremely
versatile for installation in a variety of applications. Below
are several examples of the wide variety of installation
options.
1. Spillway Bowl and Spillway Basin on an AquaBasin:
2. Spillway Bowl and Spillway Basin on top of AquaBlox
3. Spillway Bowl at the top of a stream:
aquascapeinc.com |
☎
CAN (866)766-3426 |
4. Multiple Spillway Bowls:
5. Spillway Basin in a stream:
Ex. 9
6. Spillway Basin in the middle of a pond:
General Maintenance
:
®
• Remove leaves, sticks, and debris from the feature as
needed. If necessary, drain the feature of dirty water and
refill with fresh, clean water.
• Clean the pump periodically or if water flow slows.
Winter Application
It is recommended to drain the Spillway Bowl or Spillway
Basin and store it in a frost-free location. Remove the
standpipe to drain for winterization.
☎
US (866)877-6637
5