HP 316095-B21 - StorageWorks Edge Switch 2/24 Manual - Page 22

Browse online or download pdf Manual for Switch HP 316095-B21 - StorageWorks Edge Switch 2/24. HP 316095-B21 - StorageWorks Edge Switch 2/24 41 pages. Edge switch release notes
Also for HP 316095-B21 - StorageWorks Edge Switch 2/24: Update Manual (9 pages), Manual (40 pages), Release Note (32 pages), Release Note (27 pages), Manual (26 pages), Release Note (27 pages), Release Note (25 pages), Installation Instructions Manual (24 pages), Release Note (23 pages), Release Note (23 pages), Release Note (22 pages), Release Note (23 pages), Release Note (19 pages), Release Note (19 pages), Release Note (18 pages), Instructions Manual (17 pages), Release Note (17 pages), Upgrade Instructions (16 pages), Instructions Manual (16 pages), Installation Instructions Manual (16 pages), Release Note (16 pages), Release Note (17 pages), Release Note (17 pages), Release Note (11 pages)

HP 316095-B21 - StorageWorks Edge Switch 2/24 Manual
Glossary
hub port
H_Port. In arbitrated loop devices, a port that uses arbitrated loop protocols. The physical
interface that attaches to a loop device, either an end device or another loop interconnect device
(hub).
IML
See
initial machine
inband management
Management of the director or switch through a Fibre Channel connection to a port card. See
also
out-of-band
management.
industry standard architecture
ISA. Bus architecture designed for personal computers (PCs) that use an Intel 80386, 80486, or
Pentium microprocessor. ISA buses are 32 bits wide and support multiprocessing.
information message
Software message that indicates to a user that a function is performing normally or has
completed normally. See also
initial machine load
(IML) — Hardware reset for all installed CTP cards on the director. It does not affect other
hardware. It is initiated by pushing the white button on a director's CTP card.
initial program load
(IPL) — Process of initializing the device and causing the operating system to start. Initiated
through a menu in the Element Manager, this option performs a hardware reset on the active
CTP only.
initial program load configuration
(IPL configuration) — In S/390 mode, information containing default configurations stored in a
director or switch's nonvolatile memory. The director or switch loads the file for operation
when powered on.
input/output configuration
The collection of channel paths, control units, and I/O devices that attaches to the S/390 or
zSeries processor.
input/output configuration program
A program that defines all available I/O devices and channel paths to an IBM S/390 or zSeries
processor system. Replaced by the Hardware Configuration Definition Program starting with
MVS/ESA Version 4.0.
Institute of Electrical and Electronics Engineers
IEEE. An organization of engineers and technical professionals that promotes the development
and application of electronic technology and allied sciences.
22
load.
error message
and
warning
message.
Directors and Edge Switches Glossary