HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch Installation Manual - Page 23

Browse online or download pdf Installation Manual for Switch HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch. HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch 28 pages. Fabric clustering system 24-port 4x fabric copper switch installation guide, march 2005
Also for HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch: White Paper (13 pages), Implementation Manual (9 pages)

HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch Installation Manual
Step 5. Fit the sliding rails over the fixed rails with the flanges facing outward until the flanges meet the
rack.
Figure 2-8 Fit Sliding Rail over Fixed Rail
Step 6. Attach the rails to the rack, both sides as shown in Figure 2-9.
CAUTION
Figure 2-9Attach Sliding Rail to Rack
Step 7. Securely attach all rails to the rack.

Remove Shipping Sleeve

Underneath each power supply is a shipping sleeve. Remove the shipping sleeve only if the rack is in its final
location. If you plan to transport the rack, leave the sleeve installed. To remove the sleeve, take the bezel off
and remove the entire sleeve by gently pulling on the tab. Replace the bezel.
Figure 2-10
Remove Shipping Sleeve From Under Power Supply
Chapter 2
Keep switch supported until rail is attached to the rack.
ProLiant Linux Installation Overview & Planning
Install HP Fabric Clustering System Switches
23