Alpha Professional Tools WBC5KIT Instruction Manual - Page 9
Browse online or download pdf Instruction Manual for Cutter Alpha Professional Tools WBC5KIT. Alpha Professional Tools WBC5KIT 12 pages. Wet blade cutting kit
INsTallaTIoN of GfCI
1.
Install the GFCI to the grinders power cord as shown. Connect to power and check
the GFCI for proper function.
TesTING IN-lINe GfCI uNIT
1.
Connect GFCI to a single phase AC power supply
2.
Verify that the indicator lens shows red (indicating output voltage)
3.
Press the test button to verify that the red in the indicator lens disappears
4.
Press the reset button to verify the red indicator is visible
5.
The GFCI is now ready to use
9
RESET BUTTON
TEST BUTTON
Indicator view lens
RED lens indicates power
CLEAR lens indicates no power