AlphaESS SMILE-G3-S5 Comissioning Hardware - Page 10

Browse online or download pdf Comissioning Hardware for Storage AlphaESS SMILE-G3-S5. AlphaESS SMILE-G3-S5 18 pages.

10
If the electrical appliance on backup side can work
normally, it means that the wiring of the backup has
been connected correctly.
During commissioning, if the LED indictors on the
display panel of the inverter or the battery pack
show red, please refer to chapter troubleshooting.
1.4. Installing New System and Settings on the APP
1.4.1. Download and Install the APP
Commissioning Procedures