AlphaESS SMILE-G3-S5 Comissioning Hardware - Page 16
Browse online or download pdf Comissioning Hardware for Storage AlphaESS SMILE-G3-S5. AlphaESS SMILE-G3-S5 18 pages.
16
If the electrical appliance can work normally, it means that the wiring of the
backup has been connected correctly.
During commissioning, if the LED indictors on the display panel of the inverter or
the battery pack show red, please refer to chapter troubleshooting.
1.5.3.1 Switch on all of the Breakers.
Please don't forget to switch on all of the breakers.
1.6. Instruct the End User to Install the APP
Please make sure that your end user has downloaded the APP and registered the
account correctly, and added the system SN.
Commissioning Procedures