CREE LIGHTING ZR22MT-SC1 Installation Instructions - Page 2

Browse online or download pdf Installation Instructions for Light Fixture CREE LIGHTING ZR22MT-SC1. CREE LIGHTING ZR22MT-SC1 5 pages. Commercial specification troffers with emergency driver & smartcast technology

TO INSTALL:
1
Luminaire Hooks
2
Cable Slots
3
Junction Box Cover
2 of 5
T-bar
Power Supply
1st:
90° Bend

T- BAR CEILING MOUNTING

STEP 1:
Bring the ZR-MT troffer up into the
T-Bar grid.
STEP 2:
Locate the luminaire hooks and
bend them out 90 degrees for
installation. See Figure 1.
NOTE: The luminaire hooks ship
bent in and need to be bent out for
installation.
STEP 3:
2nd: Bend
Against T-bar
Then bend the luminaire hooks
against the T-Bar to secure the
luminaire. See Figure 1.

SUSPENDED MOUNTING

STEP 1:
Disconnect power to circuit by
T-bar
turning circuit breaker OFF before
installation.
STEP 2:
Attach customer supplied cables
to the (2) cable slots on each side
of the housing. See Figure 2 and 3.
STEP 3:
Attach customer supplied cables
to mounting surface using
customer supplied hardware.
Ensuring that mounting surface
can support the luminaire.
STEP 4:
Make wiring connections per the
Electrical Connection section.
STEP 5:
Switch the circuit BREAKER on.
STEP 6:
Make sure the WIM blue LED has
a double blink pattern. If not,
please proceed to Troubleshooting
section. Otherwise, you can
proceed to commission the zone
controller. Please refer to the
Smartcast® document ion for
details. See Figure 4 on the next
page.
LPN00696X0001A0_A