Creek Company ODC XR 10 Assembly Instructions Manual - Page 3
Browse online or download pdf Assembly Instructions Manual for Boat Creek Company ODC XR 10. Creek Company ODC XR 10 6 pages.
VI. ATTACH SIDE STORAGE POCKET TO FRAME
1. Position Side Storage Pocket along Left Frame Member or Right Frame Member.
(see figure 5)
2. Wrap straps around upper rail of frame and strap down.
.
VII. ATTACH STRIPPING APRON
1. Position Stripping Apron along Left Frame Member or Right Frame Member.
(see figure 5)
2. Wrap straps around upper rail of frame and strap down.
VIII. ATTACH ROD HOLDER TO FRAME
1. Rod Holder attaches to frame using Snap Pin where Cargo Deck and Frame Members meet (can be attached to
left or right side).
X.
ATTACH ANCHOR LINE STORAGE BAG
1. Anchor Line Storage bag attaches to front of Seat Support Frame Member (see figure 10).
Figure 1
Seat Assembly
Front
View
Seat Bottom
Bottom
View
Lift and Lock
Anchor System
FORWARD
Seat
Back
Seat Pins
Seat Screws
Seat
Screw
Holes
Seat
Bottom
Side
Storage
Pocket
Figure 2
Rod Holder
Diagram
Shown attached to the
left side of boat.
Fig. 3
Detail of Snap Pin
installation
All frame parts attach with
snap pins.
Your frame assembles using
(10) Short Snap Pins. Please
follow instructions accordingly.
Cargo
Deck
Rod Holder
Left
Frame
Member