Cisco 9000 Series Installing - Page 5
Browse online or download pdf Installing for Switch Cisco 9000 Series. Cisco 9000 Series 19 pages.
Installing the Cisco MDS 9148V-K9 Switch
Caution
• Ensure that electrical circuits are sized according to local and national codes.
Caution
Unpacking and Inspecting the Switch
Caution
Tip
Note
To inspect the shipment, follow these steps:
1. Compare the shipment to the equipment list provided by your customer service representative and verify
that you have received all items, including the following:
2. Check for damage and report any discrepancies or damage, to your customer service representative. Have
the following information ready:
Avoid UPS types that use ferro-resonant technology. These UPS types can become
unstable with systems such as the Cisco MDS 9000 Series, triggered by substantial
current draw fluctuations due to fluctuating data traffic patterns.
If you are using a 200 or 240 VAC power source in North America, the circuit must be protected by a
two-pole circuit breaker.
To prevent loss of input power, ensure that the total maximum loads on the circuits
supplying power to the switch are within the electrical current ratings for circuit
for wiring and breakers.
When handling switch components, wear an ESD strap and handle modules using only the carrier edges.
Retain the shipping container in case the chassis has to be shipped in the future.
The switch is thoroughly inspected before shipment. If any damage occurs during transportation, or if any
item is missing, contact your customer representative immediately. If you purchased Cisco support through
a Cisco reseller, contact the reseller directly. If you purchased support directly from Cisco, contact
Technical
Support.
• Grounding lug kit
• Rack-mount kit
• ESD wrist strap
• Cables and connectors
• Optional items, if any, ordered
• Invoice number of shipper (see packing slip)
Unpacking and Inspecting the Switch
Installing the Cisco MDS 9148V-K9 Switch
Cisco
5