Digital Equipment VAX 4000 600A Installation Checklist - Page 5

Browse online or download pdf Installation Checklist for Desktop Digital Equipment VAX 4000 600A. Digital Equipment VAX 4000 600A 8 pages.

2.1 Verify Site Preparation
Is there adequate power for your system and its peripherals? (Site
Preparation)
If you are installing a DSSI configuration, did you make sure your site power
distribution system does not have any grounding faults? (Site Preparation)
Are you allowing enough space for your system? (Site Preparation)
Does your site maintain the proper environmental operating conditions? (Site
Preparation)
Did you gather the tools you will need? (Installation)
2.2 Check the Shipment
Did you unpack all the shipping cartons? (Installation)
Did you check the Product Delivery Document against the Content Listing or
Barcode Label for each carton? (Installation)
Did you compare the contents of your cartons with the Content Listing for
each carton? (Installation)
2.3 Position the System
Does the location for your system meet the system's weight and space
requirements? (Installation, Site Preparation)
2.4 Open the System Doors
Did you find the key to the lock in the shipping carton? (Installation)
Did you turn that key to the bottom position to unlock the upper and lower
doors? (Installation)
3