Siemens Simatic S7-300 Getting Started - Page 19

Browse online or download pdf Getting Started for Industrial Equipment Siemens Simatic S7-300. Siemens Simatic S7-300 32 pages. Automation systems, controlling a physical axis
Also for Siemens Simatic S7-300: User Manual (34 pages), Manual (21 pages), Operating Instructions (4 pages), Operating Instructions (5 pages), Manual (35 pages), Getting Started (8 pages), Getting Started (16 pages), Application Description (24 pages), Manual (18 pages), Manual (32 pages), Installation And Hardware Manual (20 pages)

Siemens Simatic S7-300 Getting Started
Step
Activity
5
In the "DP Slave Properties" dialog box, select the "Configuration" tab. Select message type "2 axes,
SIEMENS Message 102, PZD-6/10".
Note: If your actual configuration only contains one axis, select "1 axis, SIEMENS Telegram 102, PZD-
6/10" (the SIMODRIVE 611 universal demo cases use double-axis modules).
6
Change to the "Clock Synchronization" tab.
7
Set the "Synchronize drive with equidistant DP cycle", then set the time coefficients as shown below.
8
Click "Alignment".
CPU 317T-2 DP: Controlling a physical axis
Getting Started, 03/2008, A5E00251786-05
3.7 6. Step: Configuring the drive with HW Config
Result
The "Clock Synchronization" dialog box
opens.
The following components are calibrated to
the set values:
DP cycle in the DP -master system
all drive components of the same family
(here: SIMODRIVE) are calibrated based
on the same values.
Learning units
19