Siemens SIWAREX WL230 BB-S SA Equipment Manual - Page 26
Browse online or download pdf Equipment Manual for Industrial Equipment Siemens SIWAREX WL230 BB-S SA. Siemens SIWAREX WL230 BB-S SA 50 pages. Base plate and elastomer bearing bb-s sa
Also for Siemens SIWAREX WL230 BB-S SA: Manual (36 pages), Operating Instructions Manual (48 pages), Operating Instructions Manual (44 pages)
Installation
5.1 Safety information/instructions
NOTICE
Incorrect assembly of the load cell
Damaging of load cells, installation parts or load bearing implement
With load cells of smaller rated loads, there is a risk of stretching the load cell bodies when
attaching force transfer devices, e.g. when tightening locknuts.
Torsional and bending moments, eccentric loads and transverse loads are disturbance
variables. These disturbance variables cause errors in the measuring result and can damage the
load cells and compact mounting units if the maximum limits are exceeded.
• To ensure safe use of the hoisting gear, provide indented claws or crane eyebolts on the load
• Do not overload the load cells.
• Put the load bearing implement down slowly.
• Use overload protection that securely absorbs the desired loads. The overload protection
• Introduce the load in the measuring direction of the load cell.
• The mounting components normally allow so much room for movement that heat
NOTICE
Incorrect welding
Incorrect welding can damage the load cell.
• Do not conduct the welding current over the load cells.
NOTICE
Missing grounding of the load cell
Undesirable electrical currents can arise during lightning and damage the load cell.
• Bridge the load cells with highly flexible grounding cables. See the section Grounding cable
26
bearing implement.
permits a rise in weight unhindered until the setpoint weight is reached.
expansion will not result in lateral loading.
– Attach the grounding clamp of the welding unit making reliable contact close to the
weld.
– Bridge the load cells with a highly flexible grounding cable. See the section Grounding
cable (Page 12).
– Disconnect the individual load cells.
(Page 12).
Equipment Manual, 12/2020, A5E02390707B-03
SB-S SA