Cisco 15530-LCMB-0200 - ESCON Multiplexing Line Card Multiplexor Hardware Installation Manual - Page 2
Browse online or download pdf Hardware Installation Manual for Network Hardware Cisco 15530-LCMB-0200 - ESCON Multiplexing Line Card Multiplexor. Cisco 15530-LCMB-0200 - ESCON Multiplexing Line Card Multiplexor 36 pages. User guide
Chassis-Lifting Guidelines
Caution
Use extreme care when removing or installing connectors so you do not damage the connector housing
or scratch the end-face surface of the fiber. Always install protective covers on unused or disconnected
components to prevent contamination. Always clean fiber connectors before installing them.
Unpacking and Inspecting the Shelf
The Cisco ONS 15530 comes with the standard mounting set. The shelf is thoroughly inspected before
shipment. If any damage has occurred during transportation or if any item is missing, notify your Cisco
customer service representative immediately.
Upon receipt, inspect the equipment as follows:
Take inventory.
Step 1
Compare the equipment inside with the packing slip and the equipment list provided by customer
service. If there are any discrepancies, notify the Customer Service Center.
Check for external damage.
Step 2
Visually check all components and immediately report any shipping damage to your customer service
representative. Have the following information ready:
•
•
•
•
Keep a record of all of your hardware, configuration options, and network settings.
Mounting the Shelf
The unit is designed for rack-mounting in a cabinet rack. Use star-type lock washers on the rack screws
to ensure a good conductive connection between the chassis and the rack. For information about
installing the units in a customer cabinet, see the instructions from the cabinet manufacturer.
Chassis-Lifting Guidelines
The fully configured system weighs approximately 71 pounds. The chassis is not intended to be moved
frequently. Before you install the system, ensure that your site is properly prepared so you can avoid
having to move the chassis later to accommodate power sources and network connections.
Two or more people are required to lift the chassis. Each time you lift the chassis or any heavy object,
follow these guidelines:
•
•
Cisco ONS 15530 Hardware Installation Guide
2-2
Invoice number of shipper (see packing slip)
Model and serial number of the damaged unit
Description of damage
Effect of damage on the installation
Never attempt to lift the chassis by yourself. Because of the size and weight of the chassis, use at
least two people to safely lift and move it without causing injury or damaging the equipment.
Ensure that your footing is solid, and balance the weight of the chassis between your feet.
Chapter 2
Installing the Cisco ONS 15530
OL-7706-01