Cisco Catalyst 2960-XR Getting Started Manual
Using Other Management Options
Cisco Prime Infrastructure combines the wireless functionality of Cisco Prime Network Control System (NCS) and the wired
functionality of Cisco Prime LAN Management Solution (LMS) with application performance monitoring and troubleshooting
capabilities of Cisco Prime Assurance Manager. For more information, see the Cisco Prime Infrastructure documentation on Cisco.com.

Planning and Installing a Switch Stack (Optional)

Note
This section applies only to the Catalyst 2960-X and 2960-XR stacking-capable switches.
Stack Guidelines
• Connect only Catalyst 2960-X or 2960-S switches in a mixed switch stack.
You can only create mixed stacks with Catalyst 2960-X or 2960-S switches (up to four
Note
switches). You cannot create mixed stacks with other switches. Catalyst 2960-XR
switches cannot be added to mixed stacks. They can only stack with other Catalyst
2960-XR switches.
• Install the FlexStack-Plus module and the FlexStack cable.
Note
The FlexStack-Plus module is hot-swappable and can be inserted while the switch is
powered on.
• Order the appropriate cable from your Cisco sales representative. The length of FlexStack cable depends on your configuration.
These are the different sizes available:
◦ CAB-STK-E-0.5M= (0.5-meter cable)
◦ CAB-STK-E-1M= (1-meter cable)
◦ CAB-STK-E-3M= (3-meter cable)
• Make sure that you have access to the switch rear panel and to the rear of the rack.
Installing the FlexStack-Plus Module
The switch should always have a blank module installed when a FlexStack-Plus module is not used.
Note
The Catalyst 2960X-48P-L switch is shown as an example. You can install the module in other switches as shown.