Cisco SCE8000 GBE Removal And Replacement Procedures - Page 14

Browse online or download pdf Removal And Replacement Procedures for Network Hardware Cisco SCE8000 GBE. Cisco SCE8000 GBE 36 pages. 10gbe platform
Also for Cisco SCE8000 GBE: Quick Start Manual (25 pages), Configuration Manual (18 pages), Installing (21 pages)

Cisco SCE8000 GBE Removal And Replacement Procedures
Installing the Fan Assembly
Installing the Fan Assembly
Hold the fan assembly with the fans facing to the right and the FAN STATUS LED at the bottom. (See
Step 1
Figure
Place the fan assembly into the front chassis cavity so that it rests on the chassis, and then lift the fan
Step 2
assembly up slightly, aligning the top and bottom chassis guides.
Step 3
Push the fan assembly into the chassis until the power connector seats in the backplane and the captive
installation screws make contact with the chassis.
Step 4
Tighten the captive installation screws.
Step 5
Verify that fans are operational:
Cisco SCE8000 10GBE Installation and Configuration Guide
9-14
9-7.)
Listen for the fans; you should immediately hear them operating. If you do not hear them, ensure
that the fan assembly is inserted completely in the chassis and the faceplate is flush with the switch
back panel.
Verify that the FAN STATUS LED is green. If the LED is red, one or more fans is faulty.
Chapter 9 Removal and Replacement Procedures
OL-26784-02