Cisco UBR7246VXR Installation Manual - Page 18

Browse online or download pdf Installation Manual for Network Hardware Cisco UBR7246VXR. Cisco UBR7246VXR 28 pages. Universal broadband router
Also for Cisco UBR7246VXR: Quick Start Manual (27 pages), User Manual (7 pages), Hardware Installation (25 pages)

Cisco UBR7246VXR Installation Manual

Handling the Clock Card

Handling the Clock Card
Caution
Always handle the clock card by the carrier edges and handle; never touch the clock card's components
or connector pins. (See
Figure 3-1

Online Insertion and Removal

The Cisco uBR7246 VXR supports online insertion and removal (OIR), however, the clock card cannot
be "hot-swapped" in the chassis. You must power down the Cisco uBR7246 VXR when removing and/or
replacing a clock card. Removing the clock card from the chassis before powering off will cause the
router to crash.
Before you begin installation, read
Note
required for installation.

Warnings and Cautions

Observe the following warnings and cautions when installing or removing the clock card.
Caution
Do not attempt to remove or install the clock card unless you have first powered off the
Cisco uBR7246 VXR.
Do not connect the primary and/or secondary DB-15 T1 cables until the clock card has been installed in
Caution
the Cisco uBR7246 VXR.
Cisco Cable Clock Card Hardware Installation Guide for the Cisco uBR7246VXR Universal Broadband Router
3-2
Figure
3-1.)
Handling a Clock Card
Printed circuit board
Metal carrier
Chapter 3
Chapter 2, "Preparing for Installation"
Removing and Installing the Clock Card
for a list of parts and tools
OL-26705-01