Cisco UCS B200 M3 Installation And Service Note - Page 21
Browse online or download pdf Installation And Service Note for Network Hardware Cisco UCS B200 M3. Cisco UCS B200 M3 36 pages. Blade server
Also for Cisco UCS B200 M3: Installation Manual (34 pages), Installation And Service Note (37 pages), Manual (8 pages), Upgrade Manual (21 pages), Installation And Service Note (28 pages)

S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Figure 11
Removing and Installing a CPU and Heat Sink
You can only order your blade server with two CPUs, but at some point you may choose to upgrade them
to a different type. Both CPUs must be of the same type, and memory in slots intended for the second
CPU will not be recognized if the second CPU is not present (see
to use these procedures to move a CPU from one server to another, or to replace a faulty CPU.
Table 3
Table 3
Product ID
UCS-CPU-E5-2690
UCS-CPU-E5-2680
UCS-CPU-E5-2670
UCS-CPU-E5-2665
UCS-CPU-E5-2660
OL-26624-01
Removing and Replacing a Motherboard CMOS Battery
shows the available CPU options.
CPU Options for B200 M3 Servers
Power Draw (W)
135 W
130 W
115 W
115 W
95 W
+
C0
C1
C2
D0
D1
D2
CPU 1
B2
B1
B0
A2
A1
A0
Memory
Clock Speed
(GHz)
Cores
2.90
2.70
8
2.60
8
2.40
8
2.20
8
Cisco UCS B200 M3 Blade Server Installation and Service Note
Working Inside the Blade Server
Arrangement). You may need
DDR3
Cache
(MHz)
(MB)
1600
20 MB
1600
20
1600
20
1600
20
1600
20
21