Cisco 7513 Series Maintaining - Page 8

Browse online or download pdf Maintaining for Server Cisco 7513 Series. Cisco 7513 Series 20 pages. Chassis replacement
Also for Cisco 7513 Series: Quick Start Manual (44 pages), Replacement Instructions Manual (26 pages), Datasheet (11 pages), Manual (30 pages), Replacement Instructions Manual (19 pages), Replacement Instructions Manual (22 pages)

Cisco 7513 Series Maintaining
Maintenance Procedures for the Cisco 7513, Cisco 7513-MX, and Cisco 7576
Figure 7-5
Figure 7-6
Chassis
interface
board B
Step 5
Remove the old EEPROM devices from the old card cage. Note where pin 1 is and use it as a reference
insertion point. Immediately install the old EEPROM devices on the EEPROM sockets on your new card
cage. (See
Install the blank EEPROM devices)(that you removed from your new card cage and marked with tape)
Step 6
on the EEPROM sockets on your old card cage; remove the small piece of tape from the blank EEPROM
devices. Return the old card cage to Cisco Systems.
Repeat Step 5 and Step 6 for the second EEPROM in the Cisco 7576.
Step 7
This completes the procedure for exchanging the EEPROM devices, which is required only if you
exchange your existing card cage assembly for a new one.
Cisco 7500 Series Installation and Configuration Guide
7-8
Location of the EEPROM Device on the Rear of the Card Cage (Cisco 7513 and
Cisco 7513-MX)
EEPROM
device
Pin 1
Location of the EEPROM Devices on the Rear of the Card Cage
(Cisco 7576)
EEPROM B
Pin 1
Figure 7-5
for the Cisco 7513 and Cisco 7513-MX, and
Chapter 7
Maintaining Your Cisco 7513, Cisco 7513-MX, and Cisco 7576 Router
Chassis
interface
board
Chassis
interface
board A
EEPROM A
EEPROM device
Figure 7-6
for the Cisco 7576.)
OL-5008-03 B0