Install the Power and Ground
Note
Terminate the return 1 lead to the RET1 backplane terminal. Use oxidation-prevention grease to keep
Step 7
connections non-corrosive.
Warning
Terminate the negative 1 lead to the negative BAT1 backplane power terminal. Use oxidation prevention
Step 8
grease to keep connections non-corrosive.
If you use redundant power leads, terminate the return 2 lead to the positive RET2 terminal on the
Step 9
ONS 15454. Terminate the negative 2 lead to the negative BAT2 terminal on the ONS 15454. Use
oxidation-preventative grease to keep connections non-corrosive.
Step 10
Route the cables out below the power terminals using the plastic cable clamp, as shown in
page
31.
To power up the node, insert the correct fuse in the correct fuse position according to site practice.
Step 11
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
32
When terminating battery and battery return connections as shown in
follow a torque specification of 10 in-lbs. When terminating a frame ground, use the kep-nut
provided with the ONS 15454 and tighten it to a torque specification of 31 in-lbs. The kep-nut
provides a frame ground connection that minimizes the possibility of loosening caused by
rotation during installation and maintenance activity. This type of prevention is inherently
provided by the terminal block for battery and battery return connections.
Do not secure multiple connectors with the same bolt assembly.