Cisco UCS B200 M4 Installation And Service Note - Page 11
Browse online or download pdf Installation And Service Note for Server Cisco UCS B200 M4. Cisco UCS B200 M4 30 pages. For e5-2600 v4 series cpus
Also for Cisco UCS B200 M4: Installation And Service Note (46 pages), Upgrade Manual (9 pages), Servicing Manual (24 pages)
Procedure
Step 1
Grasp the front of the blade server and place your other hand under the blade to support it.
Figure 7: Positioning a Blade Server in the Chassis
Step 2
Open the ejector lever in the front of the blade server.
Step 3
Gently slide the blade into the opening until you cannot push it any farther.
Step 4
Press the ejector lever so that it catches the edge of the chassis and presses the blade server all the way in.
Step 5
Tighten the captive screw on the front of the blade to no more than 3 in-lbs. Tightening with bare fingers only is unlikely
to lead to stripped or damaged captive screws.
Step 6
Power on the server. UCS Manager automatically reacknowledges, reassociates, and recommissions the server, provided
any hardware changes are allowed by the service profile.
11