Cisco UCS B260 M4 Installation And Service Note - Page 30
Browse online or download pdf Installation And Service Note for Server Cisco UCS B260 M4. Cisco UCS B260 M4 46 pages. Blade server
Also for Cisco UCS B260 M4: Installation And Service Note (50 pages)
Installing a New CPU and Heat Sink
Step 10 Open the socket latch.
Step 11 Remove the old CPU using the CPU alignment tool. See the following figure.
Figure 14: CPU Alignment Tool
Installing a New CPU and Heat Sink
Before installing a new CPU, verify the following:
• The CPU is supported for the server. Refer to the Specification Sheet for the server to see the list of
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS
Procedure
Step 1
Remove the CPU from the packaging and load it in the CPU alignment tool, as follows:
a) Confirm that the pedestal is set up correctly for the CPU. The pedestal ships configured with the markings
"LGA2011-R1" facing upwards, which is the correct orientation.
b) Place the CPU on the pedestal. The CPU corners should fit snugly at the pedestal corners and the notches
should meet the pegs perfectly.
c) Place the CPU alignment tool on the CPU pedestal with the tool aligned with the A1 arrow pointing to
the A1 registration mark on the pedestal.
d) Press the button/handle on the tool to grasp the CPU.
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v4 CPUs
22
supported CPUs. The specifications sheets are available at this URL:
products/servers-unified-computing/ucs-b-series-blade-servers/datasheet-listing.html.
Manager will recognize and allow the new CPU.
Servicing the Blade Server
http://www.cisco.com/c/en/us/