Motorola SURFboard SBV5322 Installation Manual - Page 18

Browse online or download pdf Installation Manual for Modem Motorola SURFboard SBV5322. Motorola SURFboard SBV5322 43 pages. Modem de voz digital para 4 lineas
Also for Motorola SURFboard SBV5322: Datasheet (3 pages), Quick Start Manual (2 pages), Safety And Regulatory Information Manual (6 pages), (Spanish) Guía De Instalación (43 pages), (Spanish) Guía Del Usuario (43 pages), (Portuguese) Guia De Instalação (43 pages)

Motorola SURFboard SBV5322 Installation Manual

Installation

Installation
Before you begin the installation, you must first install the battery in your digital voice
modem. Please read
before proceeding.

Battery Installation

Place the SBV5322 on its side and remove the battery cover on the bottom.
1
Slide the battery into the battery compartment until it is fully seated. The battery is keyed
2
so that it cannot be installed incorrectly. Make sure that the pull-tab on the battery is
accessible and does not prevent the battery cover from closing properly.
Re-install the battery cover with the locking tabs seated downward, and then push the
3
cover forward.
It may take up to 12 hours to reach full charge when:
The battery is installed for the first time.
The battery is replaced.
The battery is fully discharged.
"Safety Requirements for the SBV5322 Lithium-Ion Battery"
9 —
SBV5322 SURFboard Digital Voice Modem
on page v