Ariston PK 750 RT GH AUS Operating Instructions Manual - Page 6

Browse online or download pdf Operating Instructions Manual for Hob Ariston PK 750 RT GH AUS. Ariston PK 750 RT GH AUS 44 pages.
Also for Ariston PK 750 RT GH AUS: Operating Instructions Manual (32 pages)

Ariston PK 750 RT GH AUS Operating Instructions Manual
• Spray a solution of soapy water onto all gas joints
AUS
as well as the full length of any flexible hoses.
UNDER NO CIRCUMSTANCES USE A NAKED
FLAME IN CHECKING FOR LEAKS.
If bubbles appear anywhere, turn the gas supply off,
check all connections and retest. If satisfactory
operation cannot be achieved, contact place of
purchase or their appointed agent for service.
Flame check
Turn each burner on, and ensure that the flame is
blue with minimal yellow tipping. If there is
significant yellow tipping, flame lift off or excessive
noise, check pressure and adjust at the regulator if
necessary.
If satisfactory operation cannot be achieved, contact
place of purchase or their appointed agent for
service.
Igniter operation
Check that the igniter for each burner successfully
ignites the gas.
If an igniter fails to work, first remove the plug from
the electrical power outlet, and then check that all
the electrical connections are in place.
If satisfactory operation cannot be achieved, contact
place of purchase or their appointed agent for
service.
Low flame setting
Check the low flame setting for each hob burner to
ensure that the minimum flame will not be
extinguished by air draughts.
• Light the burner.
• Turn the control until it engages in the minimum
position.
• Ensure the flame is stable and will not be
extinguished by air draughts.
To adjust the minimum flame:
Follow the procedure described in the gas
conversion instruction.
DO NOT MODIFY THIS APPLIANCE IN ANY WAY,
OTHER THAN AS DESCRIBED IN THESE
INSTRUCTIONS.
6